Lowman Student Center

Project Details:

The expansion of Lowman Student Center, which was funded by student referendum, will include a more open floor plan to bring in natural light and to create a more inviting and usable space. The lower level of the expansion will house food services to replace the existing food court with expanded indoor seating and outdoor seating located between buildings. The upper level will merge into the current LSC and connect to a top level parking garage. The Lowman expansion will provide meeting facilities, a pre-event space and 11,000 sf grand ballroom.

Engagement:

Milestone was engaged as Program Manager on behalf of Texas State University System. MPM is overseeing the project and ensuring that the project scope, budget and timeline meet the original metrics approved by the Board of Regents.

Phase I of three phase student center renovation
67,000 SF

Total Project Cost: $40M
Construction Cost Limitations: $16.6M

Project Address:

Sam Houston State University - Huntsville, TX

Milestone Personnel:

Scott LaTulipe, Project Executive
Kamal Ariss, Project Manager

Project Team:

Architecture:
EYP

General Contractor:
Whiting-Turner